Create a presentation for the project manager
based on the assigned case study (attached) that reports the project’s performance, including any current or potential deficiencies that you have identified, as well as your
recommendations for improving project performance.
Specifically, the following critical elements must be addressed. Use presentation notes (“speaker notes”) to articulate those points that are not observable in the
presentation:
A. Demonstrate how EV, PV, and AC are used to calculate the following EVM measures: cost variance (CV), cost performance index (CPI), schedule variance
(SV), schedule performance index (SPI), estimate to complete (ETC), estimate at completion (EAC), and variance at completion (VAC).
B. Employ EVM equations to calculate the EVM measures (CV, SV, CPI, SPI) for the project in the case study.
C. Explain the implications for the project in the case study when CPI is greater than or equal to 1.0, CPI is less than 1.0, SPI is greater than or equal to 1.0,
and SPI is less than 1.0.
Use Microsoft PowerPoint to create four (not including references slide) that report
the project’s performance to the project manager. Be sure to cite references using APA format.